1994 

Tribute Power Station commissioned

Tribute Power Station is the first of four stations in the Anthony/Pieman River schemes.  The station was commissioned in 1994 and houses a single Fuji francis turbine coupled to a Fuji generator.

Tribute is situated underground and supplied with water from Lake Plimsoll via the 7 kilometre headrace tunnel. Water flow from the station is discharged into Lake Murchison via an 800 netre tailrace tunnel.